Please view our brochure
OUR PROJECTS
![Corrosion Protection via the Preparation and Painting of 5No Silos - Marley Eternit, Meldreth](https://www.churchillsc.co.uk/wp-content/uploads/2020/06/marley-eternit.jpg)
Marley Eternit, Meldreth
Corrosion Protection via the Preparation and Painting of 5No Silos – Marley Eternit, Meldreth During summer 2019, Churchill Specialist Contracting […]
![Gas Holder, Cornwall](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/gas-holder-cornwall.jpg)
Gas Holder, Cornwall
Churchill Specialist Contracting carried out the design supply and installation of an Isolated Lightning Protection System for a new 570m³ Biogas System for AJ Tensile on an existing water treatment works in Cornwall.
![Ratcliffe On Soar Power Station](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/ratcliffe-on-soar-clean-deck.jpg)
Ratcliffe On Soar Power Station
Churchill Specialist Contracting Ltd were awarded the contract by E.on in 2004 for the external survey and refurbishment of 1 of 8 115m tall concrete cooling towers at Ratcliffe on soar power station.
![London Power Tunnels – Specialist Earthing](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/london-power-tunnels-specialist-earthing.jpg)
London Power Tunnels – Specialist Earthing
The National Grid have commissioned some 25 miles of tunnels up to 50m beneath the City of London
![London Power Tunnels ‐ Leak Sealing](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/london-power-tunnels-leak-sealing.jpg)
London Power Tunnels ‐ Leak Sealing
London Power Tunnels ‐ Leak Sealing London Power Tunnels is a major construction project currently being carried out on behalf […]
![Open University Milton Keynes - Lightning Protection](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/open-university-milton-keynes-lightning-protection.jpg)
Open University Milton Keynes – Lightning Protection
Open University Milton Keynes – Lightning Protection In addition to the full maintenance package Churchill conduct at the Open University, […]
![Olympic Park ‐ Bridge](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/olympic-park-bridge.jpg)
Olympic Park ‐ Bridge
Olympic Park ‐ Bridge During the construction of the London 2012 Olympic Park, the contractor discovered that the newly installed […]
![Penarth Pier ‐ Concrete Repairs to Sea Wall and Replacement of Timber Fenders](https://www.churchillsc.co.uk/wp-content/uploads/2017/02/penarth-pier.jpg)
Penarth Pier ‐ Concrete Repairs to Sea Wall and Replacement of Timber Fenders
Penarth Pier ‐ Concrete Repairs to Sea Wall and Replacement of Timber Fenders Working on behalf of Horan Construction and […]
WHAT CUSTOMER SAY
Churchill’s have always been very helpful with any service that I require, their expertise in particular fields and flexible approach to work within specific timescales is a key factor for me.
Jonathon Kerridge
Improvement Engineer, British Steel
Churchills have provided a flexible and professional service for many years, forming a good working relationship while inspecting and maintaining our chimneys across two sites