Gas Holder, Cornwall

Gas Holder, Cornwall

Churchill Specialist Contracting carried out the design supply and installation of an Isolated Lightning Protection System for a new 570m³ Biogas System for AJ Tensile on an existing water treatment works in Cornwall.

Ratcliffe On Soar Power Station

Ratcliffe On Soar Power Station

Churchill Specialist Contracting Ltd were awarded the contract by E.on in 2004 for the external survey and refurbishment of 1 of 8 115m tall concrete cooling towers at Ratcliffe on soar power station.

Olympic Park ‐ Bridge

Olympic Park ‐ Bridge

Olympic Park ‐ Bridge During the construction of the London 2012 Olympic Park, the contractor discovered that the newly installed […]